Blue-White - Chemical metering and fluid measurement solutions; chemical metering pumps, peristaltic pumps, diaphragm pumps, multi-diaphragm pumps, flow meters, flowmeters, variable area flow meters, paddlewheel flow meters, ultrasonic flow meters, engineered skid systems, single skid system, duplex skid system, triplex skid system, water analyzers...
Oswald

Industrial

C3

Installation

What’s in the Box 

The C3 Pump is shipped with the following contents: 

  • C3 Diaphragm Metering Pump 
  • Injection Valve 
  • Suction Foot Valve / Strainer 
  • Power Cord – 6 feet 
  • Mounting hardware kit (includes bottom mounting brackets and hardware to connect to pump. Extended (4.5”) mounting brackets available as an option.) 

Preparation 

The C3 Pump is designed to withstand outdoor conditions, although it is recommended to locate the pump in a protected enclosure for maximum pump life. A cool, dry location where the unit can be easily monitored is recommended. Special ventilation is not required. 

The pump can be mounted on a level flat surface. We recommend using the provided mounting brackets for secure installation.  Blue-White also offers a sturdy polyethylene (PE) Wall Shelf to mount the pump.  

Piping and Physical Installation 

The C3 Pump must be level to ensure pumping accuracy. 

If mounting the pump using the mounting bracket, follow these instructions: 

  1. Use the diagram and drawing on the manual (or below) to mount the pump and bracket to a secure location.  We recommend mounting the pump at a height where the display and indicator lights are easily visible, and where it can be easily serviced. 
  2. Ensure the bracket is mounted to the pump first using the provided hardware.  
  3. Ensure the location provides enough space for inlet and outlet connections to the pump, and ensure enough space for rear wiring.  
  4. Place the pump and secure it to the base surface using the appropriate hardware for the base surface. 

If mounting the pump to a shelf, be certain the shelf will be able to support the weight of the pump.  

image 33
image 31

Suction and Discharge Tubing/Piping Connections 

C3 Pump has five options for connections:   

  • “A” = 1/2” Hose Barb Inlet, 1/2” Male NPT Outlet, with 1/2” Male NPT Injector 
  • “B” = 1/2” Hose Barb Inlet, 1/2” Female NPT Outlet, with 1/2” Male NPT Injector 
  • “C” = 1/2” Hose Barb Inlet and Outlet, with 1/2” Hose Barb Injector 
  • “E” = 1/2” Male NPT Inlet and Outlet, with 1/2” Male NPT Injector 
  • “F” = 1/2” Female NPT Inlet and Outlet, with 1/2” Male NPT Injector 

Connecting Suction and Discharge Tubing/Piping – Typical Installation 

Before connecting the tubing or piping to the pump, be sure the pump is powered OFF. Wear protective clothing and eye protection when connecting tubing to chemicals or chemical lines. 

Connect the suction tubing to the pump, and place and secure the other end of the suction tubing in the chemical tank/source. Using the provided foot valve/strainer and weight is recommended.  

Connect the discharge tubing to the pump and then connect the other end to the discharge point. If using the provided injection valve, be sure to mount it in an upward position to prevent air bubbles from collecting.  

image 34

Injection Fitting, Foot Valves  

The injection fitting and foot valve provided with the pump will be specific to the model ordered. Additional options are available.  See the below diagram of a typical injection valve and foot valve. Note that your valves may be different.   

image 37

Wiring 

Power Wiring 

The C3 is powered by 100 to 240VAC, 50/60Hz power.  Use the provided 6’ power cord, and attach the cord at the back of the pump.  

Caution: Consult a licensed electrician when in doubt about your electrical installation.  

Control Wiring 

The C3 pump has a labeled terminal box at the rear of the pump.  All wiring connections are made via removable terminal blocks. 

Signal connection includes: 

Input Signals 

  • Remote Start/Stop Input (Dry or Wet Contact Closure) 
  • FVS (Flow Verification System) Input 
  • 4-20mA Input (pump speed control) (“V” model only) 
  • Pulse Input (AC, Square Wave) (“V” model only) 

Output Signals 

  • (1) Output Alarm – Relay, 3 amp (250VAC) or 3 amp (30 VDC) (FVS or DFD) 
  • 4-20ma output (“V” model only) 
  • Motor Active Output (Contact Closure and Open Collector) (“V” model only) 

See the rear panel images and wiring chart below for information and specifications for connecting to your electrical and control system. 

image 38

Note: Shielded cables must be used on all signal wiring.  

image 35

Wiring Diagram for C3F Models 

image 32

Wiring Diagram for C3V Models 

image 36

Refer to the instructions in the manual for detailed information. 

Please click here to see help center disclaimers.

  • Ask me a question!
Processing... ...

Stay in the know

Request a quote

Please fill out the form to request a quote.
A sales rep will reach out to you.

To select or deselect multiple products–desktop users hold [ctrl] on Windows or [cmd] on Mac and click products.

Select Products

Pumps
Flow Meters
Skid Systems
Analyzers

Please review your selections before continuing.

Product Details
Select your industry:
How did you hear about us?

We'd like to hear from you...

ImageCatalog NumberDescriptionPriceBuy